POWER PROJECTS
ENERGY CAPITAL PARTNERS - EMPIRE GENERATING
Power Generation
Year Completed: 2011

RAVENSWOOD #30 (BIG ALLIS) BBB REPLACEMENT
RePowering & Maintenance
Year Completed: 2011

EAST RIVER REPOWERING PROJECT
RePowering & Maintenance
Year Completed: 2011

ISLIP RESOURCE RECOVERY CENTER
RePowering & Maintenance
Year Completed: 2010

ASTORIA ENERGY PHASE II - STEINWAY
Power Generation
Year Completed: 2010

NYU COGENERATION EXPANSION
CoGeneration
Year Completed: 2009

CAITHNESS POWER
Power Generation
Year Completed: 2008

RIVERBAY COGENERATION PLANT
CoGeneration
Year Completed: 2008

ONE BRYANT PARK COGENERATION PLANT
Power Generation
Year Completed: 2008

LIJH ENERGY CENTER - COGEN EXPANSION
Hospital
Year Completed: 2007


LIJH Energy Center - Cogen Expansion
Project Image
Other Images
Other Images
Other Images
Company Logo

Fresh Meadow Mechanical Corp.


Engineer: WSP, Flack and Kurtz

Construction Manager: Bovis Lend Lease LMB, Inc.

Owner: North Shore Long Island Jewish Hospital Energy Center



Description
: The North Long Island Jewish campus in Lake Success, New York is a large hospital campus with over 15 different buildings all being supplied with heating and cooling from a central utilities plant. The scope of the project was the convert this central plant to cogen power and stand alone separately from the Consolidated Edison electrical grid.
 
Services provided: FMMC and FMEC provided all mechanical and electrical construction services for this project. This scope included the purchase and installation of all of the following major equipment;

Two GE Jenbacher 1.4 MW Engines, with Heat Recovery Boilers for exhaust gasses and Heat           Recovery Heat Exchangers for Engine Jacket water cooling. 
One 2000kw Caterpillar 3516B Diesel engine for emergency power to the energy facility and to the entire campus.
One Asco Emergency Power and Cogen Power Switchgear assembly for cogen and emergency power integration with the facility and campus.
One 4160V Variable Speed Drive for an existing 2000 ton York chiller.
 
FMMC furnished and installed all equipment including piping and electrical connections. FMMC also performed startup and commissioning services to bring the plant online and transfer power supply of the facility from the Consolidated Edison electrical grid to the cogen system.