Time Life Building
Project Image
Other Images
Company Logo

Fresh Meadow Mechanical Corp.


Engineer: Swanke Hayden Connell

Construction Manager: Atkinson Koven Feinberg Engineers, LP

Owner: Rockefeller Center Management Corp.



Services Provided
: Complete installation of a value engineered new 7,300 ton chiller plant and modernization of existing 2,600 ton refrigeration plant.
 
Cooling System: A new hybrid central chiller plant located in the basement.  Includes two 1,850 ton gas engine driven centrifugal chillers with parallel electrical drives, one 2,100 ton electrical centrifugal chiller and one 1,500 ton steam driven centrifugal chiller.  Chilled water is distributed to existing central air handling units by a primary-secondary pumping system.  A water side econimizer is utilized for "free" cooling.