RiverBay CoGeneration Plant
Project Image
Other Images
Other Images
Company Logo

Fresh Meadow Power, LLC


Engineer: Industry and Energy Associates, LLC

Construction Manager: FMMC

Owner: Riverbay Corporation



Description
: EPC Contract (Engineer, Procure and Construct) Including the supply and installation of one  150,000 PPH 875 PSI High Pressure Steam Boiler, two Siemens SGT-400 combustion turbine generators, one Siemens SST-300 steam turbine generator, two IST once-thru steam generators and all of the ancillary support equipment including three gas compressors, fuel oil pumps, boiler feed pumps, ammonia storage and handling, electrical switchgear and distributed control system.