Description:
Natural Gas Fired 50 Megawatt (MW) Electric Generating
Facility (Peaking Unit) located in Far Rockaway,
NY. Comprised of one (1)Pratt & Whitney FT-8
TwinPAC 50 with a single generator coupled to
Envirokinetics
Selective Catalytic Reduction (SCR) Unit and stack
with the following supporting systems:
Ammonia Injection, Demineralized Water, Fire Protection
Loop, Lubricating/Hydraulic
Oil, Fuel Oil Supply Piping,
Compressed Air, City Water, pump skids and
accessories.
Services Provided:
Rigging, complete erection of SCR. Furnished and
installed all pipe, valves, fittings and associated
hardware for Balance of Plant (BOP) equipment.
Excavation to support underground piping installation
Coordinated
services of multiple trades including Boilermakers,
Plumbers, Steamfitters, Operating Engineers and
Laborers, and provided continued site support through
intensive system flushing and startup until final
commercial operation.