Edgewood Energy Project

Owner -  PPL Edgewood Energy, LLC 
Engineer -  Parsons Energy & Chemicals Group, Inc. 
General Contractor -  Modern Continental Corporation 

Description:

Natural Gas Fired 80 Megawatt (MW) Electric Generating Facility (Peaking Unit) located in Edgewood, NY. Comprised of two (2) General Electric, LM6000 SPRint Gas Turbine Generators coupled to Deltak Selective Catalytic Reduction (SCR) Units and stacks respectively with the following supporting systems:
Spray Intercooling (SPRint) Water, Ammonia Injection, Spray Mist Evaporative Cooling, Continuous Emissions Monitoring, Demineralized Water, Fire Protection Loop, Lubricating/Hydraulic Oil, Natural Gas Supply Piping including Gas Compressors, Waste Water, Effluent Sumps, Utility Gas Metering Station, Compressed Air.

Services Provided:

Rigging, erection and alignment of all major pieces of equipment. Installed Gas Metering Skid, Gas Compressors and piping from KeySpan Supply to Gas Turbines. Furnished and installed all pipe, valves, fittings and associated hardware for balance of plant equipment. Coordinated services of multiple trades including Millwrights, Boilermakers, Plumbers, Steamfitters, Operating Engineers and Laborers and provided continued site support through intensive system flushing and startup until final commercial operation.



Services Utilized
  Installation
 
Power Projects
Kings Plaza
SUNY - Old Westbury
Calpine - Bethpage Energy Center
Pinelawn Power
SCS Astoria Energy
Equus Energy Project - EPC
Fuel Cell Installation Projects
Freeport Energy Project
Greenport Energy Project
Shoreham Energy Project
Edgewood Energy Project
Bayswater Energy Project
 
© 2006, Fresh Meadow Mechanical Corporation