New 12 Story Medical Research Building
Reinforced Concrete and Curtain Wall
Services Provided: Complete installation of heating, air
conditioning, and steam sterilization services as per plans and specifications.
Heating System: Central heating plant located on the
12th. floor consists of three (3) 400 HP Cleaver Brooks water boilers and one (1) 125HP
water boiler. These boilers feed hot water to the perimeter fin tube heating systems,
vav boxes with reheat coils, and to the Built-up Air Handlers located on the 7th. and
12th. floor machine rooms. In addition, hot water is supplied to the domestic water heat
exchangers.
Heat recovery system: Heat recovery coils are located in the
Built up Air Handling and General Exhaust on the 7th. and 12th. floors.
Steam Sterilization: Two (2) 300HP Cleaver Brooks 125psi
boilers located on the 12th. floor boiler room, provide steam to floors 2 - 13 for laboratories.
Cooling system: Central cooling plant located on the 12th. floor
consists of three (3) Trane Chillers, feeding chilled water to the Built-up Ait Handlers
located on the 7th. and 12th. floors.