New hospital - 15 stories
Services provided: Complete
installation of heating and air conditioning systems as per plans
and specifications for the three major mechanical equipment
rooms.
Heating system: Installed new high
pressure steam reducing station to provide low pressure
steam for steam to water heat exchangers for the reheat coil systems.
Provide low pressure steam to heating coils in 40 central air
handling units on the two cellar and 9th floor mechanical
equipment rooms. Provide low pressure steam to domestic water
heaters.
Cooling system:
Tapped central cooling plant chilled water system
and extended in new building. Provided chilled water
to 40 central air handling unit on the two cellar
and 9th floor mechanical equipment rooms, including
new pumping station.
Emergency generator system: Provided
new fuel oil system to (3) generators including generator
exhaust system up through building to main floor.