Provide the turnkey removal and replacement of two (2) 70,000 PPH
high pressure steam boilers, a 500kw emergency
generator, deaerator, condensate storage tanks,
three (3) boiler feedwater pumps, a fuel oil forwarding
system and two (2) 40,000 gallon buried fuel oil
tanks. The project includes the installation of
fifty piles to support the new boilers, a new electrical
service, renovation to the existing 175' stack,
new ID fans on two existing boilers and a new breeching
system.