New Office Building - 900,000 Square Feet, 40 Stories of Offices,
lobbies, retial space and specifically "raised floor" commodity
trading areas.
Services provided:
Complete installation of all "Wet Side" heating and
cooling systems along with all the redundant equipment
and piping systems required to facilitate uninterruptable
trading.
Heating system:
A 39,000#/Hr. high pressure steam reducing station supplies
steam to various heat exchangers throughout the building
for conversion to hot water for perimeter fin tube radiation
and Variable Air Volume (VAV) fan powered boxes. Seven
Built-Up Air Handlers varying from 48,000 to 80,000 cfm
on the 10th. Floor & Roof supply core heating using
low pressure steam coils. A heat recovery coil system is
utilized to reclaim spent heat from the exhaust ductwork.
Cooling system:
Four (4) 1100 Ton Electric Centrifugal Chillers work in unison
with a four (4) cell Cooling Tower on the 36th. Floor to provide
chilled water to all air handlers and fan coil units for
mechanical cooling. An economy cylce is incorporated utilizing
Plate & Frame Heat Exchangers to provide "free cooling"
during the swing season when conditions are right. Pump skids
utilizing In-Line Pumps with HP ratings over 100HP are used to
circulate chilled and condenser water throughout. A "Green"
tank in the buildings basement reclaims all steam and chilled
water condensate for re-use as makeup for the condenser water
system.