Existing 48 Story Office Building
Services provided:
Complete installation of Value Engineered New 7,300
ton Chiller Plant and modernization of Existing
2,600 ton Refrigeration Plant.
Cooling system:
New Hybrid Central Chiller Plant located in
the basement. Includes (2) 1,850 ton gas engine driven centrifugal
chillers with parallel electrical drives, (1) 2,100 ton
electrical centrifugal chiller and (1) 1,500 ton steam driven
centrifugal chiller. Chilled water is distributed to existing
central air handling units by primary-secondary pumping
system. Water side economizer is utilized for "free" cooling.
The implemented Value Engineering reduced the cost
and duration time of construction.